| SPECIFICATION | |
| Usage | Automotive interior products |
| Mold type | Thermoplastic injection mold |
| Raw material | PC+ABS |
| Finishing | Polishing A1, core side 600# sand paper. |
| Cavity No. | 1 Cav. |
| Construction | 2-plate mold with Slider |
| Demold mechanism | Slider is actuated by angular pillar pins. |
| Injection | Hot runner transfers to Cold runner by subgate. |
| Mold material | 1.2343 ESR 48-52 HRC, A/B plate, 1.2311, Mold base LKM |
| Mold size | L450xW350xH476mm, |
| Components | HASCO standard, Z81/9/R1/4 |
| Machine Tonnage | M/C 180 Tonnage |
| Cycle time | 30 sec, mold temperature 60°C. |
| Mold lifetime | 1,000,000 shots |
| FA lead-time | 8 weeks from order released |
| Delivery time | 16 weeks since order placed. |
| One of NEOK's business is injection mold making on the guide lines of as followed, 1. Mold identification Tag. 2. Pocket for mold identification Tag. 3. Mold painting. 4. Mold Base Design and Eyebolt 5. Guides and Interlocks. 6. Safety requirements. 7. Cooling system (Manifold and water connections). 8. Hydraulic Manifold and connectors. 9. Hot runner plug and connections design. 10. Micro switch connections design. 11. Ejection system. 12. Standards components. 13. Mold Design CAD files. Engineers & mold designers are qualifed on mold specification trainings. They not only design mold according to customer's specification ,but also present good suggestion to customers during mold design. Project Engineers serve customer at one-station from order to mold delivery. Weekly progress report is a regular job. 5 to 10 samples free after every mold trial is sent to customer's review. Before mold building knock-out, professional DFM is submited to customer for approval. Guides and Interlocks. |
|