| SPECIFICATION | |
| Usage | Automotive article |
| Mold type | Thermoplastic hot runner injection mold |
| Raw material | PA6+15GF |
| Finishing | Technical Polishing sand paper 600# |
| Cavity No. | 1 Cav. |
| Construction | 2-plate with insulation plates (material G6) |
| Demold mechanism | Double ejection group plates, double ejection with electrical sensor. |
| Injection | Hot runner system x 1 hot drop, brand Synventive |
| Mold material | 1.2343 ESU, 48-52 HRC, A plate(AS) , B plate(DS) and ejection plate 1.2312 |
| Mold size | L400xW350xH480mm, HASCO ejection guiding bushes set. |
| Components | HASCO waterline plugs, connectors & ejection pin, |
| Machine Tonnage | M/C HT160T, |
| Cycle time | 30 sec, mold temperature 95°C. |
| Mold lifetime | 1,000,000 shots |
| FA lead-time | 4 weeks |
| Delivery time | 10 weeks |
| The Automotive injection mould with hot runner system mold, steel is 1.2343 ESU hardened, 48-52HRC vacuum heat treatment , mold base A plate(AS) 1.2312, B plate(DS) 1.2312. Since ribs on angular lifter, double ejection is needed for ejection of part by 2 steps. ejection plate group is made of material 1.2312 as well. single open sprue direct to top of part. injection mold making supplier in China can purchase HASCO or DME standard mold base in local market.-Automotive mold
The concerns to the mold is how to cut off sprue material on part of PA6+GF15. some engineers advised to use thermal cutting plier to remove it. but actually we removed it applying sudden force to let it crack off by use of rod, leaving nozzle scrap flatted. How efficiency. Some good idea always is followed good mold design but sometime comes from post mold Engineering Solution. Due to double ejection plate groups, the stack height of mold is bigger. For plastic injection mold design, engineering designer regularly considers mold stack height for press Day night distance. AS normal rules 3 hours continuous cycle molding to check if mold running in press is stable without mechanism broken off, during first hour check if the mold temperature is constant. Before mold packing, QC team checked whole mold by checking list to all components together with project engineer. Sincerely yours! Thanks a lot for reading! |
|