FREE SHIPPING ON ALL BUSHNELL PRODUCTS

Electronic Static shielding cover stamping Die

Short Description:

size L320xW450xH220mm, Stamping progressive tool for Electronic Article production.Hardened Steel SKD11, SKH51.Strip material is Carbon steel..Punching speed is 180~200 RPM. Tolerance +/-0.005mm, Tool life time 20KK punchings. press 60T. Good quality and low-cost with short period of fabrication.

  • Usage: Electronic shielding cover
  • Tool type: Progressive stamping Die
  • Raw material_strip: Carbon Steel, thickness,0.6mm
  • Parts number per punch: 1 parts off per punching
  • Punch&Matrix_ material: SKD11, SKH51 steel.
  • Tool size: size L320xW450xH220mm,
  • Product Detail

    Product Tags

    SPECIFICATION
    Usage Electronic shielding cover
    Tool type Progressive stamping Die
    Raw material_strip Carbon Steel, thickness,0.6mm
    Parts number per punch 1 parts off per punching
    Construction 2-plates design with 1 stripper plate
    Punch&Matrix_ material SKD11, SKH51 steel.
    Tool size size L320xW450xH220mm, 
    Components MISUMI STD guiding system
    Press Tonnage M/C 60T press, 
    Stamping speed 80-120 rpm
    Tool lifetime 10KK punching
    FA lead-time 25 dyas
    Delivery time 35 days
    Progressive stamping Die made in China,connector tooling,punch and Die.
    NEOK engages in business of progressive stamping Die, sheet froming, blanking and bending.
    All punches was treated by vaccum & cryogenic to get a long lifetime , avoiding of crack.Processing tolerance +/-0.002mm by Wire-cutting machine made in Japan & PG grinding.
    Article tolerance within +/-0.005mm, it normally takes 3 times of trials before tool delivery.
    Punch and matrix material,  VHM, 1.2379, ASP23, SKH51, SKD11, etc.
    Tool standard, FIBRO、AGAGHON、RABOURDIN,MISUMI、PUNCH、PROGRESSIVE、DANLY、etc.for overseas tooling services. it is easy to maintain tools or replace standard components during mess production.

    Stamping Die tools, progressive stamping Die and tool,punch and Die made in China,terminal parts
    PVD coating machined spare parts,DLC coating machined spare parts

    Low cost of fabrication and on time delivery with good quality in progressive tool. 24 hour inquiry service.
    Exclusive tool engineer is designated to the project's following-up. tool design in house.
    DFM, 1 day,
    >>> layout design,2 days
    >>> tooling drawings,3 days,
    >>> tool fabrication, 12 days,
    >>> tool trial, 3 days
    >>>tool delivery, 2 weeks after T1 trial.
    10 samples free for custimer's approval x 3 times of trials with inspection report.
    Stamping sucess for custimers.
    DLC coating machined parts,punch and Die spare parts
    Ceramic punch and ceramic pin gauge,carbide punch and Die
    DLC coating punch and Die insert,DIN standard punch and matrixes sets.

    Best regards!
    NEOK's sales team.

     


  • Previous:
  • Next:

  • Write your message here and send it to us