FREE SHIPPING ON ALL BUSHNELL PRODUCTS

Electronic connector 1.0mm Stamping bending blanking

Short Description:

Punch & Matrix Material, SKD11, SKH51 Hardness HRC 58-62. Conbined bending & blanking in the the progressive tool, Heat treatment by vaccum and cryogenic treatment for long lifetime. stamped article's dimension tolerance +/-0.01mm. Tool life time 20KK. Press 60T. Good quality with low-cost at short period of fabrication.

  • Usage: Electronic connetor for Appliance.
  • Tool type: Progressive stamping tool
  • Raw material_strip: brass, T=1.0mm
  • Parts number per punch: 1 parts off per punching
  • Punch&Matrix_ material: SKD11, SKH51
  • Tool size: L280xW400xH230mm,
  • Product Detail

    Product Tags

    SPECIFICATION
    Usage Electronic connetor for Appliance.
    Tool type Progressive stamping tool
    Raw material_strip brass, T=1.0mm
    Parts number per punch 1 parts off per punching
    Construction 2-plate progressive
    Punch&Matrix_ material SKD11, SKH51
    Tool size L280xW400xH230mm, 
    Components MISUMI
    Press Tonnage M/C 40T press, 
    Stamping speed 80~120 rpm
    Tool lifetime 10,000,000 punching
    FA lead-time 4 weeks since order/25 days
    Delivery time 8 weeks since order/2months
    Progressive tools including bending and blanking, steel is selected good quality material , vacuum heat treatment and cryogenic treatment for long tool life time.processing tolerance to +/-0.002mm, punched parts with tolerance +/-0.005mm.
    Extra idle stations always was considered into the stations number for modification or dimension adjustment.
    Die and matrix material, VHM, 1.2379, ASP23, SKH51, SKD11, carbide etc.
    Components, FIBRO、AGAGHON、RABOURDIN,MISUMI、PUNCH、PROGRESSIVE、DANLY、etc.

    Stamping Die tools, progressive stamping Die and tool,punch and Die made in China,terminal parts progressive stamping Die made in China,connector tooling,punch and Die
    PVD coating machined spare parts,DLC coating machined spare parts
    DLC coating machined parts,punch and Die spare parts
    progressive-deep-drawing,progressive stamping Die,progressive Die stamping

    Low cost of fabrication and on time delivery with good quality in progressive tool. 24 hour inquiry service.
    Exclusive tool engineer is designated to the project's following-up. tool design in house.
    DFM, 1 day, >>> layout design,2 days >>> tooling drawings,3 days, >>> tool fabrication, 12 days, >>> tool trial, 3 days>>>tool delivery, 2 weeks after T1 trial.
    10 samples free for custimer's approval x 3 times of trials with inspection report.
    Stamping sucess for custimers. Precision tool from sucessful design.

    Looking forward to precious inquiry.

    Best regards!
    NEOK's sales team.

     


  • Previous:
  • Next:

  • Write your message here and send it to us